After a couple of dry days we decided we would be able to get the new gate installed so that the farmer can secure his field boundary.The team hauled the gate equipment across the fields from Soulton Road to the site of the very sad stile.
The ground was very soggy and the holes rapidly filled with water – but they got the job done.

As you can see they were very pleased with the result.
